[1]
Durand, G.A., Moreno, M.S., Mele, F.D., Montagna, J.M. e Bandoni, A. 2014. Comparing the performances of two techniques for the optimization under parametric uncertainty of the simultaneous design and planning of a multiproduct batch plant. Iberoamerican Journal of Industrial Engineering. 5, 10 (ago. 2014), 42–54.