AEROSPACE MANUFACTURING INDUSTRY: A SIMULATION-BASED DECISION SUPPORT FRAMEWORK FOR THE SCHEDULING OF COMPLEX HOIST LINES

Autores

  • Natalia Paola Basán National Scientific and Technical Research Council (CONICET) and Universidad Nacional del Litoral (UNL)
  • Raúl Pulido Technical University of Madrid (UPM)
  • Mariana Evangelina Cóccola National Scientific and Technical Research Council (CONICET)
  • Carlos Alberto Méndez National Scientific and Technical Research Council (CONICET) and Universidad Nacional del Litoral (UNL)

Palavras-chave:

Simulation, Hoist Scheduling Problem, Optimization, Chemical Tanks

Resumo

This paper presents an advanced simulation model for short-term scheduling of complex hoist lines. This problem, generally found in aerospace and electroplating industries, includes several hard constraints that should be considered: single shared hoist, heterogeneous recipes, eventual recycle flows, and no buffers between workstations. Different heuristic-based strategies are incorporated into the computer model in order to improve the solutions generated over time. The aim is to reduce the number of products that must be discarded while minimizing the makespan. In addition, a graphical user interface was developed for quickly evaluating simulated schedules.

Biografia do Autor

Natalia Paola Basán, National Scientific and Technical Research Council (CONICET) and Universidad Nacional del Litoral (UNL)

Industrial Engineer and PhD student at National Scientific and Technical Research Council (CONICET), INTEC (UNL –CONICET), Güemes 3450 Santa Fe, 3000, Argentina, E-mail: nbasan@intec.unl.edu.ar.

Raúl Pulido, Technical University of Madrid (UPM)

Engineer and PhD student, Technical University of Madrid (UPM), José Gutiérrez Abascal, 2. Madrid, 28006, Spain, E-mail: raul.pulido@gmail.com.

Mariana Evangelina Cóccola, National Scientific and Technical Research Council (CONICET)

Engineer and PhD student at National Scientific and Technical Research Council (CONICET), INTEC (UNL –CONICET), Güemes 3450 Santa Fe, 3000, Argentina, E-mail: marcoccola@santafe-conicet.gov.ar.

Carlos Alberto Méndez, National Scientific and Technical Research Council (CONICET) and Universidad Nacional del Litoral (UNL)

Titular Professor of Industrial Engineering at Universidad Nacional del Litoral (UNL) and Researcher of the National Scientific and Technical Research Council (CONICET), INTEC (UNL –CONICET), Güemes 3450 Santa Fe, 3000, Argentina, E-mail: cmendez@intec.unl.edu.ar

Referências

AGUIRRE, A., et al. Applying a simulation-based tool to productivity management in an automotive-parts industry. Proceeding..., of 2008 Winter Simulation Conference. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc., 2008. pp. 1838-1846.

AGUIRRE A., et al. A simulation-based framework for industrial automated wet-etch station scheduling problem in the semiconductor industry. Proceeding..., of 23rd European Modeling & Simulation Symposium, 2011. pp. 384-393.

AGUIRRE, A., et al. Applying MILP/heuristic algorithms to automated job-shop scheduling problems in aircraft-part manufacturing. Iberoamerican Journal of Industrial Engineering, 5(10), 2014. pp. 26-41.

BANKS, J., et al. Discrete-Event System Simulation. 4thed. New Jersey: Prentice-Hall, Inc., 2004.

CRAMA, Y. Conditional optimization models for production scheduling in automated manufacturing systems. European Journal of Operation Research 99 (1), 1997. pp. 136-153.

GRUBBS, C. A. Surface treatments-anodizing of aluminum. Metal Finiching 100 (1), 2002. pp. 463-478.

KUJAWSKI, K.; SWIATEK, J. Intelligent scenario selection in dynamic hoist scheduling problem: the real-life electroplating production line case analysis. Proceeding..., of the world congress on engineering, 2010.

MANIER, M. A.; BLOCH, C. A classification for hoist scheduling problems. International Journal of Flexible Manufacturing Systems, 15(1), 2003. pp. 37-55.

RIERA, D.; YORKE-SMITH, N. An Improved Hydrid Model for the Genetic Hoist Scheduling Problem. Annals of Operation Research, 115, 2002. pp. 173-19.

THIESING, R.; WATSON C.; KIRBY J.; STURROCK D. SIMIO Reference Guide. Version 6.0. SIMIO LLC, 1990.

YIH, Y. An algorithm for hoist scheduling problems. The International Journal of Production Research, 32(3), 1994. pp. 501-516.

Downloads

Publicado

2017-09-05

Como Citar

Basán, N. P., Pulido, R., Cóccola, M. E., & Méndez, C. A. (2017). AEROSPACE MANUFACTURING INDUSTRY: A SIMULATION-BASED DECISION SUPPORT FRAMEWORK FOR THE SCHEDULING OF COMPLEX HOIST LINES. beroamerican ournal of ndustrial ngineering, 9(17), 100–117. ecuperado de https://incubadora.periodicos.ufsc.br/index.php/IJIE/article/view/v9n1706